Compliance Gate Documents
Layer 1 documents protect the economics of the clean stream at intake. They are designed to stop misclassification, contamination, and avoidable downstream cost before the load is accepted as clean.
LAYER 1 - INTAKE
Separate clean wood before the mistake gets expensive
Compliance Gate, intake capture, and first-pass exception review.
- - Site notes, photos, and material context captured before pickup.
- - Clean-vs-suspect screening protects the lower-rate stream early.
- - Ambiguous loads move to manual review instead of guesswork.
- - Better intake discipline means fewer downstream billing disputes.